Doncaster Rail Study: Doncaster Rail Study

Skip to content
  • Home
  • About
  • Your Say
  • Publications
  • Contact

Tag Archives: options

Feedback on proposed corridor themes now closed

Posted by SCampbell on June 5, 2012

Thank you to everyone who provided feedback on the Doncaster Rail Study proposed corridor themes. The feedback period is now closed. Read more »

Community Options Workshops Summary Report

Posted by SCampbell on May 2, 2012

The summary report from the Doncaster Rail Study Community Options Workshops held in March is now available on our Publications page. Read more »

Community Options Workshops Presentation

Posted by SCampbell on April 19, 2012

The presentation from the Doncaster Rail Study Community Options Workshops held in March is now available on our Publications page.  Read more »

Ideas Booths

Posted by SCampbell on April 2, 2012

We will be holding Ideas Booths after the Easter school holidays to seek further community input about the three possible rail corridor themes.    Read more »

There’s still time to RSVP…

Posted by SCampbell on March 18, 2012

There’s still time to RSVP to attend one of three community workshops to learn about progress with the Study, including the route options being considered. Read more »

Minister Terry Mulder announces medium list corridor themes

Posted by SCampbell on March 8, 2012

The Doncaster Rail Study has reached an important milestone with the identification of three corridor themes. These themes will guide the final recommendation of a preferred route for a rail line to Doncaster. Read more »

  • RSS
  • Twitter
  • Facebook
  • Google+

Navigation

  • FAQs
  • Feedback
  • Events
  • Timeline

Your Say

  • 266 votes Do you think a rail line to Doncaster is a good idea?
    127 comments
  • 122 votes Route 48 tram extension
    11 comments
  • 61 votes The railway must extended to the PINES Shoppoing Centre in East Doncaster as there are more and more residents and new houses there
    19 comments
  • 35 votes Light Rail Proposal - Route 48 upgrade and extension to The Pines SC and Mitcham Station, with 109 tram extension to Templestowe
    4 comments
  • 25 votes Doncaster and the pines railway can be modelled on the Vancouver Skytrain and London's Docklands Light Railway
    5 comments
  • 24 votes Option 3 - But fully commit!
    10 comments
  • 23 votes The line should be modelled on Perth's Mandurah line
    3 comments
  • 20 votes Metro-Trams
    5 comments
  • 19 votes If youre going to build a rail link through Manningham, it should go through the centre of the municipality and all the way to Warrandyte.
    2 comments
  • 19 votes The best of both worlds...
    5 comments

Twitter


Tags

  • All Aboard (2)
  • Community (18)
  • Consultation (17)
  • corridor (8)
  • Cost (1)
  • engagement (11)
  • Feedback (6)
  • Input (10)
  • Involve (1)
  • Local Government Group (1)
  • maps (3)
  • Modelling (1)
  • News (5)
  • options (6)
  • Patronage (1)
  • Rail Study (13)
  • Recommendation Report (5)
  • Report (1)
  • Study Bulletin (3)
  • Workshop (4)

Categories

Translate

Translate this page

Latest updates

  • Community Information Sessions
  • Public feedback deadline extended
  • View the Draft Report at your local Library
  • Doncaster Rail Study Phase One Draft Recommendations Report released

Background

The Doncaster Rail Study is an independent investigation into a heavy rail connection from the Melbourne CBD to Doncaster.

Social

  • RSS
  • Twitter
  • Facebook
  • Google+

Bookmark us

http://www.doncasterrailstudy.com/

Contact

Doncaster Rail Study, PO Box 312, Flinders Lane, Melbourne VIC 8009
Telephone: 1800 800 007
@Doncaster_Rail
info@doncasterrailstudy.com

  • URS
  • AECOM
  • AURECON
  • SKM
  • State Government of Victoria
  • © 2012 Doncaster Rail Study
  • Disclaimer
  • Guidelines
  • Forum FAQ
  • Privacy Statement
  • Terms of Use
  • Acknowledgement
  • Contact